Repair East Gym Floor Building

Location: Albuquerque, NM

Project Value: $53,818

Dates of Construction: 9/2007 – 12/2007 (85 Calendar Days)


Project Scope

Work included the demolition of a wood floor members in the weight room; cleaning the supporting concrete slab; applying a special chemical bonding agent to the slab’s surface; placing reinforcing steel; pouring/finishing the new concrete floor slab; install a resilient athletic flooring.

Frame Picture Frame Picture Floor and subfloor were removed and disposed of. Once removed, the slab-on-grade concrete was vacuumed, cleaned of sawdust and construction debris, and power washed. After properly cleaned, rebar was placed to offer additional strength for a new concrete slab. A bonding agent was applied to the old concrete surface. A new 3000 psi concrete floor was then poured monolithically & without cold joints. The concrete mix was finished with a smooth trowel and sealed with a urethane caulking. Once complete a new rubberized athletic floor was installed with precision accuracy to comply with owner’s astringent standards.