SCIF Renovation
This project consisted of renovating a preexisting Secure Communications/Information Facility (SCIF) into two operable SCIF’s in the same building. Complex scope included construction of STC 45 & 50 wall partitions from floor to deck in order to meet SCIF certification requirements. Other major improvements were the intrusion and security upgrades to allow for building usage in highly sensitive Air Force missions. Other project components included computerized raised floors and STC 50 windows.
Kirtland AFB, NM, $639,793.
View More Information
-
Add/Alter F-22 Jet Engine Maintenance Shop
The Add/Alter F-22 Jet Engine Maintenance Shop project consisted of removal of asbestos VCT floor tiles, electrical upgrade for new lighting and crane system (Due to the age of building and installation of previous electrical components it was discovered that the previous system had no separate equipment grounds on any of the branch circuits. Equipment grounds were added to the scope with no delay in schedule.) Engine bays were provided with several new gas fired heater units and a new reconfiguration of the existing heaters. Four restrooms (2 men/2 women) were completely renovated with updated fixtures. (Prior to project, Bldg occupants complained of sewage backup and odor. Replacement of entire underground sewer line was included in the original scope. During partial excavation it was noticed that underground sewer line was concrete piping with no backup or leaks. Interior wall investigation concluded that the existing sewer drain piping did not have the correct drainage angle per Plumbing code which caused backup and odor. Interior piping was replaced and sewage drainage system works as advertised.) Also installed were two new overhead crane systems as well as new urethane flooring for a clean finished look.
Holloman AFB, Alamogordo NM, $1,460,314.
View More Information
-
AFOTEC Command Section & Facility Repair
Project consisted of complete interior renovation to include all building finishes. Major work performed included complete building asbestos abatement, relocation of interior partitions, and additional voice/data/power throughout occupied office space. Additional work consisted of new doors and hardware, new foyer and stairwell floor tile, new carpet, paint, chair rail, window valances, casework, accent lighting, and entry way mud mat. Scope of work applied to two floors and three wings totaling over 82,000 sq. ft.
Kirtland AFB, NM, $890,202.
View More Information
-
Honeywell Flight Test Area
The project consisted of all concrete work, asphalt, fencing, electrical, tower erection/flight control system installation as well as general contractor services required to complete construction of the Class 1 UAV Flight Area. Approximately 80,000 square feet of parking was converted into an outdoor tethered flight area to allow for controlled testing of Honeywell’s Class 1 Unmanned Air Vehicle. Primary components of the project consist of two 110 ft. high guyed towers with a tensioned tether and a flight control system to allow for electronic/mechanical arrest of the UAV. A pre-engineered building for flight operations was also placed on the site.
Albuquerque, NM, $521,197.
View More Information
-
Veterans' Affairs Pharmacy 797 USP Upgrade
The VA Pharmacy consisted of a 797 USP Upgrade which involved a Class 5 Cleanroom. Project consisted of a complete remodel of an existing, working pharmacy in order to comply with USP certification. Scope included new wall partitions, flooring, medical grade equipment installation, electrical service, and complete Class 5 cleanroom HVAC upgrade. The pharmacy cleanroom was certified within 3 days of substantial completion and the renovation took place during working business hours while the space was occupied.
Veterans; Affairs Raymond G Murphy Medical Campus, NM, $307,262.
View More Information
-
New Mexico Consortium Probe Computer Facility
Project consists of the construction of two computer rooms in the Los Alamos Research Park. Construction includes mechanical and electrical support infrastructure necessary to support the two new computing rooms.
Los Alamos NM $2,426,469
View More Information
-
Living Desert Zoo & Gardens State Park
Ground up construction of two hoof stock barns.
Carlsbad, NM, $1,371,865. | View More Information
View More Projects